Denning Close
Project Details
Location Denning Close
Nature
Project Size 2000
Sector
Duration 29 Weeks
Value
Project included the demolition of the existing house and forming a full depth basement in the foot print. Upon completion of the basement the project included the super structure, brickwork and roof.
Challenges
The site was located in an area of old redundant land drains. As such there was continual water management required.